According to Tekla, of the $3.5 trillion spent worldwide on commercial construction, 20 percent goes to waste. That’s $700 billion flushed due to preventable design inaccuracies. Even with computers to work out...
Fabricator

CURVE, CAMBER, AND SWEEP IN STRUCTUAL STEEL BEAMS
When designing with structural steel, does it have to be all straight runs, angles and joints?